The entry level Thermal Spray Set-Up Technician (Surface Prep & Blast Operations) supports the thermal spray technicians by preparing parts for dimensional restoration. This position primarily prepares and configures the equipment and materials for the thermal spray process. Technicians will apply masking to components for in-process operations, conduct a variety of surface preparations using the blasting process on turbine engine components, and use a variety of materials following the established procedures for both masking and grit blasting.
Additional Postings available from Component Repair Technologies
NDT Supervisor (Multiple Shifts)
Material Handler (2nd and 3rd Shift) Full-Time, Entry Level
Parts Cleaning Technician (2nd and 3rd Shift) Full-Time, Entry Level
Material Handler Supervisor (1st Shift) Full-Time
Power Wash Technician (2nd and 3rd Shift) Full-Time or Part-Time, Entry Level
Maintenance Assistant (1st Shift)
Facility Supervisor (1st shift, Mon-Fri)
Facility Maintenance Scheduler (1st shift, Mon-Fri)
Accounts Payable Specialist (1st Shift, Mon-Fri)
ID/OD Grind Machinist (2nd Shift, Mon-Fri & Full-Time)
CNC VTL Machinist - Experienced (1st Shift, Mon-Fri, Full-Time) or (Weekend, Fri-Mon)
Customer Program Manager (Full-Time)
Process Engineer - Weld (Full-Time, Mon-Fri)
Process Engineer - Machine (Full-Time, Mon-Fri)
Production Supervisor - Weld (1st Shift, Mon-Fri)
Visual/Dimensional Inspector (2nd or 3rd Shift, Mon-Fri)
Production Supervisor (2nd Shift, Weekend)
Shipping and Receiving (2nd shift, Mon-Fri)
Quality Engineer (On-Site Only, 1st Shift, Mon-Fri)
Manual Mill Machinist - Experienced (2nd or 3rd shift, Mon-Fri, Full-time)
Blast Technician (1st, 2nd, or 3rd Shift, Mon-Fri)
NDT Supervisor - Level II (2nd or 3rd Shift, Mon-Fri) or (1st Shift, Weekend, Fri-Mon)
Process Engineer Manager (Full-Time, Mon-Fri)
Production Supervisor - Weld (1st Shift, Mon-Fri)